ProFutbol > Stadiums > Nou Mestalla, Valencia

Nou Mestalla, Valencia

Makieta Nou Mestalla.

Basic information

  • Cost of construction: EUR 340 million[1]
  • Capacity: 0 seats (planned: 70 044)
  • Opening date: 11 July 2027
  • Address: Calle a Pp Sector 1 Ademuz Pg, 41, Benicalap, 46015 València Valencia
  • Country: Spain
  • Owner: Klub Valencia CF
Construction stopped in 2009 due to financial crisis. Initially, the capacity had been planned to be 75,000, however the design of the stadium has changed, however the stadium design was changed with a new proposed capacity of 54000 seats. In 2024, the original plans were restored.

More stadiums